General Installation
Logo Back to Article
Frequently Asked Questions
LodgingAC

Installation > General Installation


Question:
What are some things I should know before performing an installation?

Answer:
These installation instructions provide easy-to-understand information for installing, operating, and maintaining these packaged air conditioners and heat pumps. The following models are covered in this book:

52SC Cooling only 60 Hz
52SE Cooling with electric heat 60 Hz
52SQ Cooling, electric heat, and heat pump 60 Hz
All models are designed for through-the-wall installation. Separate installation instructions are included with all accessory components.

UNIT INSPECTION
Examine unit for damage incurred during shipment. File a claim immediately with the transit company if damage is found.

The data information plate (Figure 1) lists the model number, voltage ranges, and other important electrical information about this product. Reading and understanding this material is important for proper use of this unit. To access the information plate, the front panel must be removed; see Figure 2.

To remove the front panel:

1. Grasp panel firmly near top of both sides.

2. Pull panel up then forward.

IMPORTANT: The front panel has to be off the unit to complete future checks and installation procedures. Do not reinstall front panel at this time.

Using Figures 1 and 3 as reference, verify that the packaged terminal product ordered will operate properly in your facility. If you do not understand the information given or have questions about the product, please call your local dealer or distributor.

GeneralInstallation
FIGURE 2 - REMOVING FRONT PANEL

GeneralInstallation
FIGURE 3 - MODEL NUMBER NOMENCLATURE